Nepal floods expose risks to
hydropower in a
warming Himalayas 1 of 2 | This photo provided by the
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army, shows
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army soldiers using a drilling machine during a rescue operation at the site of a
hydropower project in
Upper Trishuli,
Nepal, Sunday, Aug. 30, 2026. (
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army via
AP) 2 of 2 | This photo provided by the
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army, shows
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army soldiers carrying the body of a victim on a stretcher during a rescue operation at the site of a
hydropower project in
Upper Trishuli,
Nepal, Sunday, Aug. 30, 2026. (
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army via
AP) 1 of 2 | This photo provided by the
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army, shows
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army soldiers using a drilling machine during a rescue operation at the site of a
hydropower project in
Upper Trishuli,
Nepal, Sunday, Aug. 30, 2026. (
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army via
AP) 1 of 2 This photo provided by the
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army, shows
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army soldiers using a drilling machine during a rescue operation at the site of a
hydropower project in
Upper Trishuli,
Nepal, Sunday, Aug. 30, 2026. (
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army via
AP) Add
AP News on Google Add
AP News as your preferred source to see more of our stories on Google. Share 2 of 2 | This photo provided by the
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army, shows
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army soldiers carrying the body of a victim on a stretcher during a rescue operation at the site of a
hydropower project in
Upper Trishuli,
Nepal, Sunday, Aug. 30, 2026. (
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army via
AP) 2 of 2 This photo provided by the
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army, shows
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army soldiers carrying the body of a victim on a stretcher during a rescue operation at the site of a
hydropower project in
Upper Trishuli,
Nepal, Sunday, Aug. 30, 2026. (
Nepal-army" class="entity-link entity-organization" data-entity-id="194000" data-entity-type="organization">
Nepal Army via
AP) Add
AP News on Google Add
AP News as your preferred source to see more of our stories on Google. Share Updated [hour]:[minute] [AMPM] [timezone], [monthFull] [day], [year] DHADING,
Nepal (
AP) — Workers shoveled thick mud from a flood-ravaged power station in central
Nepal, trying to revive a key node that supplies electricity to more than 20,000 people. But as they cleared debris from equipment buried by last week’s catastrophic
floods, there was hope the plant would not simply be rebuilt in the same place, beside the river that destroyed it.In
Nepal, up to 900 workers are unaccounted for from a dozen
hydropower projects, according to the
Nepal" class="entity-link entity-organization" data-entity-id="197164" data-entity-type="organization">Independent Power Producers’ Association,
Nepal, with hundreds believed trapped in tunnels. In
Nepal and
China combined, over 900 people have died and 4,700 are missing. The loss of
hydropower infrastructure is estimated to have taken 700 megawatts offline — about 10% of the country’s power capacity. Once the immediate aftermath of the disaster is dealt with, the question of how to restore power, roads, bridges, schools and health facilities quickly without rebuilding the same vulnerabilities should be on top of Nepalese authorities’ minds. disaster experts said. “Authorities have to take a hard look in the mirror now and ask how they will be rebuilding in these places. They will also have to take a close look at other projects in
Nepal that have not been built yet, whether they’ll be approved after this event,” said Jakob Steiner, a geoscientist at the University of Graz in Austria, who is currently based in Dhaka, Bangladesh. 2 MIN READ 5 MIN READ 2 MIN READ Rebuilding for resilience, not just replacementHydropower projects that were operating or under construction were fully or partly destroyed across Rasuwa, Nuwakot and Dhading, among the worst-hit districts.Many of the workers had taken shelter in the tunnels but are stuck, waiting to be rescued, according to officials. “The tunnels are built to access
hydropower infrastructure and to divert water,” Steiner said, describing the tunnels as big enough to drive trucks through. Apart from the
hydropower projects, tens of kilometers (miles) of roads, multiple bridges and essential buildings like schools and hospitals have been destroyed.Ramraj Narasimhan, a senior director with the Coalition for Disaster Resilient Infrastructure, said rebuilding should focus on continuity of services rather than trying to make every structure indestructible. “If it gets damaged, let it get damaged, but can we build in redundancy in the system?” he said.That can mean choosing a better location for construction, alternate routes, backup power, improved early warning and financial tools such as insurance to speed recovery, Narasimhan said. Risk assessments should examine where a river bends, where slopes are unstable and where a single failure could cut off several communities.Narasimhan’s organization estimates that $124 billion worth of
Nepal’s infrastructure is exposed to climate-driven disasters, creating the potential for hundreds of millions of dollars in losses each year. A report by the coalition earlier this year found that
Nepal’s average annual losses are nearly $760 million from various disasters, while the country’s national disaster funds is only a fraction of this amount. Climate risks grow for Himalayan hydropowerClimate scientists said the Himalayan region — which is
warming faster than many other parts of the world — is particularly at risk from increasing global
warming as a result of human-caused climate change.Climate experts said the flooding adds to evidence that infrastructure planning in the
Himalayas is being forced to account for disasters that are increasing as the climate warms. Glaciers across the Hindu Kush Himalaya are losing ice at an accelerating rate, while permafrost degradation, unstable slopes, glacial lakes and increasingly erratic rainfall are raising the risks of
floods, landslides and debris flows, according to reports by Kathmandu-based climate research group International Center for Integrated Mountain Development.The stakes are particularly high for
Nepal because
hydropower is both a foundation of its electricity grid and an important source of economic growth and export revenue. Much of the country’s potential is run-of-river
hydropower, Narasimhan said, meaning facilities are closely tied to steep river corridors where land is limited and hazards can cascade quickly.Steiner said smaller
floods can sometimes be managed with diversions that keep debris and high flows away from expensive infrastructure and tunnels. But for events as large as the latest flood, he said, physical defenses may be overwhelmed. In those cases, early warning becomes the critical protection for people. He said the flood was detected at the
China-
Nepal border after moving rapidly from its source, leaving little warning time upstream. But there was still time as the flood traveled downstream toward
hydropower sites, raising questions about whether warnings could have reached workers sooner.The disaster is also likely to intensify scrutiny of where future projects are approved. Himanshu Thakkar, coordinator of the South Asia Network on Dams, Rivers and People, said environmental, social and disaster-risk assessments need to reflect the specific landscape and past hazards of each valley, backed by land-use rules and stronger accountability.
hydropower projects can themselves become “force multipliers” when large structures, debris and altered river channels add to downstream damage, Thakkar said. He argued that
Nepal should also consider more decentralized solar power as part of a broader energy mix. Thakkar said the question now is not only how fast
Nepal can rebuild, but what it chooses to put back in the path of the next flood.___Sibi Arasu reported from Bengaluru and can be followed on X at @sibi123. Reach him at [email protected].___The Associated Press’ climate and environmental coverage receives financial support from multiple private foundations.
AP is solely responsible for all content. Find
AP’s standards for working with philanthropies, a list of supporters and funded coverage areas at
AP.org. Milko is an Associated Press multimedia reporter covering the nexus of the energy transition, climate change and human rights across Asia-Pacific. Sibi reports on climate change from India and South Asia